Roofing · Advanced
Roof Replacement Guide
Tear-off, underlayment, shingles and flashing — what to expect from a full re-roof.
- • Roofing shovel
- • Hammer or roofing nailer
- • Chalk line
- • Tin snips
- • Utility knife
- • Fall-arrest harness
- • Architectural asphalt shingles
- • Synthetic underlayment
- • Ice & water shield
- • Drip edge
- • Ridge vents
- • Flashing (step & counter)
Step-by-step
- 1
Decide: tear off or overlay
Tear-off is nearly always the right answer in 2026. Overlays add weight, hide deck rot, and most manufacturers void warranties on layer-two installs. Budget for full tear-off.
- 2
Protect the property
Tarp landscaping and set up plywood ramps over gutters. Dumpster placement matters — nails will end up wherever the dumpster is, so put it on the driveway, not the lawn.
- 3
Tear off to the deck
Remove all old shingles, underlayment, flashing and nails. Inspect the deck for soft spots and replace any damaged sheathing. Sweep with a magnet.
- 4
Install underlayment and ice shield
Ice & water shield on the eaves (6 ft up from the wall line in cold climates), in valleys, and around all penetrations. Synthetic underlayment everywhere else — no more felt.
- 5
Install drip edge and flashing
Drip edge under underlayment at eaves, over underlayment at rakes. Step flashing at every sidewall, counter-flashed into the siding.
- 6
Lay shingles
Start with a starter strip along the eaves. Stagger courses per manufacturer spec. Use 6 nails per shingle in high-wind zones (most of the USA now qualifies). Nails go in the nail zone — high nails void the warranty.
- 7
Install ridge vent and cap
Cut a 1" vent slot along the ridge, install ridge vent, and cap with matching cap shingles nailed above the vent baffle.
Related calculators
Was this guide helpful?
People also searched
Safety note: this guide is educational. Always follow local building codes, pull required permits, and hire a licensed pro for structural, electrical, gas or plumbing work when in doubt.
More guides
How to Install a Pre-Hung Interior Door
Shimming, plumbing and hanging a pre-hung door so it latches cleanly and stays where you leave it.
Read FramingHow to Frame a Basement Wall
Moisture control, wall placement, bottom plates on concrete and the framing sequence for a basement finish that lasts.
Read PlumbingHow to Replace a Kitchen Faucet
A 60–90 minute swap done properly: shutoffs, the basin wrench problem, supply lines and leak testing.
ReadRelated articles
How to Measure a Roof for Shingles: Bundles and Squares Explained
Convert footprint to roof area using pitch multipliers, then turn square feet into squares, bundles and accessories.
Read RoofingAsphalt vs Metal Roof: 2026 Cost, Lifespan and ROI
The upfront gap is closing — here's when metal actually pays back.
Read