Flooring · Beginner
How to Install Laminate Flooring
Underlayment, layout, cuts, expansion gaps and trim — click-lock in one weekend.
- • Miter saw or jamb saw
- • Tapping block
- • Pull bar
- • Rubber mallet
- • Spacers
- • Tape measure
- • Utility knife
- • Click-lock laminate planks (+10% for waste)
- • Foam underlayment with vapor barrier
- • Transition strips
- • Quarter round or shoe molding
Step-by-step
- 1
Acclimate the flooring
Stack unopened boxes flat in the room for 48–72 hours so the planks adjust to humidity. Skipping this causes buckling later.
- 2
Prep the subfloor
Vacuum thoroughly. The subfloor must be within 3/16" of flat over 10 ft. Sand high spots on plywood; fill low spots with leveler on concrete.
- 3
Roll out underlayment
Butt seams — don't overlap. Tape seams with the manufacturer's tape. On concrete, use underlayment with a built-in vapor barrier.
- 4
Plan the layout
Measure the room and calculate how wide the last row will be. If it's less than 2", rip the first row narrower so both edges look balanced. Run planks parallel to the longest wall or toward the main light source.
- 5
Install the first three rows
Leave a 3/8" expansion gap on all sides using spacers. Click the long edge first, then tap the short end tight with a tapping block. Stagger end joints at least 12" between rows.
- 6
Cut around obstacles
For door jambs, undercut them with a jamb saw and slide the plank underneath — never trim the plank to fit around them. It looks amateur.
- 7
Finish the last row and trim
Rip the last row to width leaving the 3/8" gap. Pull the last plank tight with a pull bar. Install quarter round nailed to the baseboard (never to the floor) to hide the gap.
Related calculators
Was this guide helpful?
People also searched
Safety note: this guide is educational. Always follow local building codes, pull required permits, and hire a licensed pro for structural, electrical, gas or plumbing work when in doubt.
More guides
How to Install a Pre-Hung Interior Door
Shimming, plumbing and hanging a pre-hung door so it latches cleanly and stays where you leave it.
Read FramingHow to Frame a Basement Wall
Moisture control, wall placement, bottom plates on concrete and the framing sequence for a basement finish that lasts.
Read PlumbingHow to Replace a Kitchen Faucet
A 60–90 minute swap done properly: shutoffs, the basin wrench problem, supply lines and leak testing.
ReadRelated articles
How Many Square Feet of Flooring Do I Need? (Adding the 10% Waste Rule)
Measure irregular rooms correctly, pick the right waste percentage for your pattern, and order by the carton — not the square foot.
Read FlooringHardwood vs LVP vs Laminate: The 2026 Flooring Showdown
Costs, lifespans, moisture tolerance and resale impact of the three biggest floor categories.
Read FlooringCarpet vs Hard Flooring When You Have Pets
Claw resistance, accident recovery and the flooring that actually survives dogs.
Read